SSA Automotive is a auto parts agency& manufacturer established in 2004, Is the pioneer producer of the fuel supply unit in China. We have completed functional department include R&D, QA, Manufacturing Department, Equipment Engineering Department, Laboratory, Purchasing Department, Logistic Department, Project team and Finance controlling.
In R&D, We can use CAD, CAE , We can build up 3D module according to the requirements from customer, And we use Finite Element Analysis software solve the problem in Hydraulic, Elec&magnetic, Stress , Impact etc. Also we have a good lab to do the related test, Include the life time operating, Temperature cycle testing, Special fuel testing, Vibration testing, EMC testing, Noisy testing, We also have a completed specification for all of testing issue.
Our QA is composed by three function team, SQA(supplier QA), CQA(customer QA) and PQA(production QA).
In the factory , We have a armature line with automatic machine, The rotor winding,
...[More] Turning, And Dynamic balancing equipments are produced by top company in the world.
Our pump assembly line located in a Dust Free Factory, In this workshop, We control the temperature and humidity, The powerful air conditioner and fresh air exchanging system make the plus air pressure inside, The Dust Free Factory make us can produce the pump in a cleaning condition.
Our fuel pump final tester is a fully automatic machine, With the potent software and many complex mechanical components, We will provide the exact parameters and record by our industry computer , And we will keep them at least 20 years, That means it’s easy to find the original parameter if we or customer want.
The final tester located in an Anti- Explosion room with special building structure and material, Keeping constant temperature and humidity, Also the floor is Anti- Static.
The parts is very important , So we have strict purchasing process the approval procedure, We require all the parts must approve by material, Dimension , Function, And lifetime validation, The assy validation, We use the parts until all the PPAP and validation is completed.