Street Address: 9/ 10 Jintai Building Nanping Street Nanan District
City: Chongqing
Province: Chongqing
Country/Region: China
Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing. Technique index: 1. Three way independent test power, the maximum output current is 0.5A. 2. Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the 3.Maximum sampling rate can reach 400KHz 4. Tester set sampling rate:10~20KHz 5. Maximum save time of single waveform:6.4s 6.Transition resistance measuring scope:0~40Ω 7.Measuring precision: 10% 8.Power supply: 220V±10% power:200W 9. Size: 410mm´320mm´260mm 10. Weight: 20kg