Product Attribute:
Applicationt: 
Changan
Production Description:
CNC Milling
Precision Machined Brass Part
JST Industry is a professional manufacturer of CNC Milling, CNC Machined Components and CNC Turning, most of the parts were used in the field of medical, aerospace & aviation, precision instruments, food equipment, optics & electronics. The material includes stainless steel, free-cutting steel, titanium alloy, aluminum, brass and plastic; the finish treatment we could do are polishing, nickel plating, zinc plating, QPQ, anodizing, heat treatment, powder coating, etc.. Based on our experienced engineers & QC team, we could make these machined components exactly according to your drawings or samples.
Product Description
Name & Description |
Precision Machined Brass Part |
Material |
Brass |
Finish Treatment |
Deburring & Cleaning |
Tolerance |
+/-0.02MM |
Application |
Medical Device |
Packaging & Delivery
Packaging: 20 PCS in a PET tray, 15 KGS in a carton.
Delivery: The samples delivery is about 15 days and the lead time for mass production is about 30-45 days.
1. CNC Milling
Precision Machined Brass Part
JST Industry is a professional manufacturer of CNC Milling, CNC Machined Components and CNC Turning, most of the parts were used in the field of medical, aerospace & aviation, precision instruments, food equipment, optics & electronics. The material includes stainless steel, free-cutting steel, titanium alloy, aluminum, brass and plastic; the finish treatment we could do are polishing, nickel plating, zinc plating, QPQ, anodizing, heat treatment, powder coating, etc.. Based on our experienced engineers & QC team, we could make these machined components exactly according to your drawings or samples.
Product Description
Name & Description
|
Precision Machined Brass Part
|
Material
|
Brass
|
Finish Treatment
|
Deburring & Cleaning
|
Tolerance
|
+/-0.02MM
|
Application
|
Medical Device
|
Packaging & Delivery
Packaging: 20 PCS in a PET tray, 15 KGS in a carton.
Delivery: The samples delivery is about 15 days and the lead time for mass production is about 30-45 days.