Applicationt: 
universal
Production Description:
STM-130: FOUNDITION PIT -3 LAYER PARKING EQUIPMENT SYSTEM
Direction for use
1, Each group includes a top platform, a middle platform and a bottom platform. These three platforms do up-and-down movement simultaneously.
2, When bottom platform moves down to the bottom of foundation-ditch, top platform is exactly on ground level to receive or release autos.
3, Middle platform moves to ground level to receive or release autos.
4, When top platform move up to topmost, bottom platform is just at ground level to receive or release autos.
5, After middle and bottom platforms are occupied, press” reset”, equipment would move down into foundation-ditch.
6, Before equipment must be traffic lane for drivers to drive in or out.
Physical Dimension Parameter List
Suited cars
Model
Medium-sized
Large-sized
Super-sized
Car size (mm)
L×W×H 4700*1800*1450
L×W×H 5000*1850*1550
L×W×H 5300*1900*1550
Car weigh (kg)
≤1500
≤1700
≤2100
Required
Space
A(mm)
2400
2500
2600
B(mm)
5100
5400
5700
C(mm)
N×A+400
D(mm)
(Pit depth)≥3800
Model specification This model is suitable established outdoors with a 4-metre-deep foundation-ditch. Both parking platforms and framework are below ground and no steel structure above ground, so this equipment respects people’s visual impression and does not hinder sun -light Simplicity of operation. Press platform number, the right platform would automatically rise up to ground level to receive or release autos
1.reasionable price
2.optimized space
3.stable movement
4.enviromental protection