Home » Showroom » » Products » Other parts » China Highland Portable Pressure Gauge Calibration Machine For Hydraulic Repair Factory
Company Info
Jinan Highland Hydraulic Pump Co. , Ltd

Street Address: No. 26 Beiyuan Road

City: Jinan

Province: Shandong

Country/Region: China

View Contact Details

China Highland Portable Pressure Gauge Calibration Machine For Hydraulic Repair Factory

China Highland Portable Pressure Gauge Calibration Machine For Hydraulic Repair Factory

Application:  Acura

Market Type:  After Market

Packing:  Wooden Package

Maximum Prodcution Capacity:  100

Delivery Time:  7days

Place of origin:  China

Export Ratio:  71% - 80%

Unit Price:  USD 1400

Price Terms:  FOB

Delivery Port:  Qingdao

Payment Terms:  T/T

Minimum Order:  1Set/Sets

Product Attribute:

Applicationt: 

Acura

Production Description:

  • Pressure Gauge Calibration
  •  
  • MYHT series portable hydraulic tester is a method for detecting hydraulic pumps, hydraulic motors, hydraulic valves and hydraulic system failures special instrument.
    - Easy to use, the operator does not require full-time training.
    -MYHT hydraulic system hydraulic tester is an ideal tool for accident prevention.
    - In the case of normal operation of equipment, technicians can safely and easily accomplish online detection tasks.
    - Simultaneous online measurement of flow, pressure, and temperature.
    - Patent No.: ZL 2005 2 0080054.
    -X traffic to 500L/min
    - Pressure to 420bar
    - Single, bi-directional load
    Instrument features:
    - Accurate measurement of flow, pressure, temperature.

 

Integration design for testing hydraulic pump, motor, valve or transmission

 

Easy to and instant use

 

Ideal for testing hydraulic system and prevent from breakdown arising. 

 

Shift Switch for reading flow and temperature

 

Built-in loading valve

 

Accurate measurement

 

One-way load

 

Light weight, portable, convenient

 

Chargeable Lithium Battery (12V) with big capacity and long useful life

 

Warning:  

 

The loading valve should be at turn-on position. Otherwise, danger will arise.

 

Only the test result is precise with oil temperature kept at 30°C or above

 

Open loading valve before test

 

Cut off power after completion of test

 

Maintenance

 

Load valve: In correct connection of power, if the load valve could not work, check if there is any jam inside it.

 

Battery: The battery is able to continuously work over 30 hours and should be charged 48 hours for one time.

 

Send your message to this supplier

Enter between 20 to 3,000 characters, English only.
http://en.gasgoo.com/new/common/contactsupplier.aspx?type=4&id=1108734