Home » Showroom » » Products » PCB » Temperature Control & Calibration PCB Assembly - Fast Electronic Prototype‎
Company Info
Shenzhen Grande Electronics Co. , Ltd

Street Address: Rom A510-512, Automobile Mansion, No. 45, Zhenhua Road, Futian District

City: Shenzhen

Province: Guangdong

Country/Region: China

View Contact Details

Temperature Control & Calibration PCB Assembly - Fast Electronic Prototype‎

Temperature Control & Calibration PCB Assembly - Fast Electronic Prototype‎

Application:  Greattong

OEM No/Model:  1

Market Type:  After Market

Packing:  Anti-Static Bag And Compartmental Packing

Maximum Prodcution Capacity:  2,000,000 Pcs/ Month

Delivery Time:  3-4 Weeks

Place of origin:  China

Export Ratio:  41% - 50%

Unit Price:  USD 2

Price Terms:  EXW

Payment Terms:  T/T

Minimum Order:  1Piece/Pieces

Product Attribute:

Applicationt: 

Greattong

Production Description:

Supplier: Shenzhen Grande Electronics 
Layers: 4 
PCBFR-4/1.6mm, 1oz finished copper 
Application: Temperature Control & Calibration PCB Assembly - Fast Electronic Prototype
Surface Treatment: ENIG 

PCBA Lead time:3-4 weeks 

Packing: Anti-static bag and compartmental packing 

Twist: 0.75% 

 

 

Description 
1, PCBA turnkey solution for Temperature Control & Calibration PCB Assembly - Fast Electronic Prototype;
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout. 
3, Electronic Manufacturing Service. 
4, SMT&DIP&PTH&BGA. 
5, Components Sourcing. 
6, Quick PCBA prototype. 
7, X-ray test, the Internal Circuit Test (ICT) , Function Test (FCT) 
8, Sample and small batch order are accepted. 



PCBA Service 
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing. 
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping. 


PCBA Quality Assurance 
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines. 
3, All line workers wear anti-static and dust-proof clothing. 
4, All operators should pass strictly training before they start work. 
5, SMT Equipmentsolder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering and Semi-auto DIP 
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber3D CMMX-Ray. 
7, PCBA TestICT, Functional Circuit Test and X-ray test. 
8, Package Processed 
0402, 0603, 0805, 1206, 1608, 2125, 3216 
Micro QFP 0.2mm 
Flip-chip, BGA, Connectors 
BGA Ball Pitch=0.2mm 
9, Each workstation in accordance with the SOP 
10, MaterialsFR-4, FPC, AluminumHigh TGHalogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on. 
11, Material BrandKB, SHENGYI, NANYA and so on. 


PCBA Lead Time 
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customers requirement. 

Send your message to this supplier

Enter between 20 to 3,000 characters, English only.
http://en.gasgoo.com/new/common/contactsupplier.aspx?type=4&id=1130118