Quick Details
-
Color:
Silver
-
Voltage:
12v
-
Current:
5A
-
Material:
ABS Alloy
- Place of Origin:
Dongguan
- Samples:
Charge
- Sample Price:
36
- Delivery Time:
20-25 Days
- Delivery Port:
Shenzhen
- Max. Production Capacity:
20000pcs/Month
- Export Ratio:
81% - 90%
- OE Experience:
No
Product Name:2008-2011 Toyota Camry Steering Wheel Audio Control Switch Buttons(NT-P-2113-E)
2008-2011 Toyota Camry Steering Wheel Audio Control Switch Buttons(NT-P-2113-E)
Application
Toyota
Product Description:
OEM No/Model: 84250-06180
2008-2011 Toyota camry steering wheel switch buttons switch(NT-P-2113-e)
1.toyota camry switch
2.OE: 84250-06180
3.can be painted different colors
4. 100% test before delivery
There are more than 500 pcs different auto switches in our factory, including Fog Light Switch, Hazard switch, Seat heater switch, AC switch, Power window switch, Volume switch, Answer switch, Door lock switch, Stereo switch, Defrost switch, etc.
With 200000 pcs monthly sales
CE,UL,CSA,Rosh, ISO9001:2008 Approvals
Easy in operation
Established in 1998, Dongguan New Top Auto Parts Co., Ltd, is a leading and fast-growing company for auto parts. There are 300 people work in our factory. We have introduced our production equipments and testing equipments from Japan, Germany, Taiwan! Our factory is according to Iso9001 ...[Read More]
Company Profile:
- Main Product:
Auto lamps, wire harness, auto switches, auto connector, hid harness, standard and non-standard wires, Pcb control system,high-temperature electronic wires
- Business Type:
Manufacturer
- Current Export Market:
North America, South America, Western Europe, Eastern Europe, Eastern Asia, Southeast Asia, Mid East, Africa, Oceania
- Total Annual Sales:
USD 2,000,001 - 5,000,000
Factory Profile:
- Number of Employees:
201 - 300 People
- Shift:
2
- Size of Factory In Square Meters:
4000
- Years of OEM Experiences:
11
- Certification:
E-mark, UL, ISO 9001
Research & Development:
- Capability for Synchronized Development:
Develop according to drawing or samples provided by clients?Yes
Develop 3-D model and prototype according to client's needs?Yes
- Lead Time for New Product Development:
15---30 days
- Tooling Design:
Design Internally
- Source of Tooling:
Made Internally
- Software/Profile:
Unigraphics, AUTOCAD, Autodesk Inventor, Pro/E