1.What about the working flow?
Received the purchasing order------Design------Confirming the drawing/solutions------Prepare the materials------CNC------CMM------assembling------CMM------Inspecting------(3rd parts inspections if need)------Package(with wooden)------delivery
2.What is the lead time for the product after confirm the drawing?
Normally,the leadtime is 15-25days,for specially complicate parts,the lead time will be 45days.
3.What kinds of software could support for design?
UG8.0,UG10.0,Catia V5,CAD 2007;