1. Measuring the insulation operation under the wet conditions, checking the part of internal circuit component
That can't access to rain, fog, dew or snow melt moisture, It may cause corrosion, leakage or accidents if the part access to the moisture
2. According to IEC 61215-2005, UL 1703-2004
Apparatus
1. Shallow sink
Inner dimension 2600× 2200mm
Material: PVC Insulation
2. The room should be big enough that the solution inside submerge the whole module
A. Resistivity not exceeding 3500 Cm
B. Surface tension not exceed 0.03N M-1
C. Temperature: 22° C± 3° C
The solution should deep enough, not include lead box entrance
3. Sprinklers with the same solution
4.500V available current limit with DC power
5. Equipment that for measuring the insulation resistance
Procedure
A. Inlet leads should be sprayed wholly by the solution, if the module connect to plug-in connector, plug- in Should be soaked in the solution during testing
B. The speed that not exceed 500V S-1 increase the voltage until 500V, should be kept 2 min, then test the insulation resistance
C. Reduce the voltage to zero, made the short-circuit of test equipment leading-out Terminal, for releasing voltage from internal module
Solar PV Module Wet Leakage Current Tester
1. Measuring the insulation operation under the wet conditions, checking the part of internal circuit component
That can't access to rain, fog, dew or snow melt moisture, It may cause corrosion, leakage or accidents if the part access to the moisture
2. According to IEC 61215-2005, UL 1703-2004
Apparatus
1. Shallow sink
Inner dimension 2600× 2200mm
Material: PVC Insulation
2. The room should be big enough that the solution inside submerge the whole module
The solution should deep enough, not include lead box entrance
3. Sprinklers with the same solution
4.500V available current limit with DC power
5. Equipment that for measuring the insulation resistance
Procedure
A. Inlet leads should be sprayed wholly by the solution, if the module connect to plug-in connector, plug- in
Should be soaked in the solution during testing
B. The speed that not exceed 500V S-1 increase the voltage until 500V, should be kept 2 min, then test the insulation resistance
C. Reduce the voltage to zero, made the short-circuit of test equipment leading-out Terminal, for releasing voltage from internal module
Related Product Tags:
aluminium foil , automatic line machine , bandsaw blade , battery thermal protector , series battery thermal protector , tube bending machine , bending machine , blasting machine , shotblasting machine , blow molding machine , blow moulding machine , briquetting press , bucket elevator , camshaft grinding machine , CBN INSERT , chain block , chain hoist , cleaning machine