Quick Details
-
Current:
5A
-
Color:
Black
-
Application:
fog light
-
factory:
yes
-
warrantly:
1 year
- Designed Capacity:
5pcs/Month
- Available Capacity:
20000Set/Month
Product Name:2011 Toyota Alitis, Corolla,Prado, Yaris OEM Fog Light Wire Harness Kits(NT-P-2085-Wire)
2011 Toyota Alitis, Corolla,Prado, Yaris OEM Fog Light Wire Harness Kits(NT-P-2085-Wire)
Application
Toyota Corolla, Altis,Prado
Product Description:
1. Toyota OEM fog lamp switch
2.Made of ABS
3. 100% test before delivery
4. meet with switch+wire harness+auto relay
Fog lamp switch used for 2011 Toyota Altis, Corolla, Prado, Yaris(NT-P-2085-Wire)
There are more than 500 sets different auto wire harness in our factory, including fog light harness, auto engine haness, subway harness, stereo wire harness, brake light wire harness, HID harness, electricity wire harness etc.
with 200000 set monthly sales.
Fog lamp harness with switch, auto connectors and auto relay
Throught CE, UL, CSA, Rosh Certificates
samples can be offered freely
Established in 1998, Dongguan New Top Auto Parts Co., Ltd, is a leading and fast-growing company for auto parts. There are 300 people work in our factory. We have introduced our production equipments and testing equipments from Japan, Germany, Taiwan! Our factory is according to Iso9001 ...[Read More]
Company Profile:
- Main Product:
Auto lamps, wire harness, auto switches, auto connector, hid harness, standard and non-standard wires, Pcb control system,high-temperature electronic wires
- Business Type:
Manufacturer
- Current Export Market:
North America, South America, Western Europe, Eastern Europe, Eastern Asia, Southeast Asia, Mid East, Africa, Oceania
- Total Annual Sales:
USD 2,000,001 - 5,000,000
Factory Profile:
- Number of Employees:
201 - 300 People
- Shift:
2
- Size of Factory In Square Meters:
4000
- Years of OEM Experiences:
11
- Certification:
E-mark, UL, ISO 9001
Research & Development:
- Capability for Synchronized Development:
Develop according to drawing or samples provided by clients?Yes
Develop 3-D model and prototype according to client's needs?Yes
- Lead Time for New Product Development:
15---30 days
- Tooling Design:
Design Internally
- Source of Tooling:
Made Internally
- Software/Profile:
Unigraphics, AUTOCAD, Autodesk Inventor, Pro/E