Quick Details
- Place of Origin:
China
- Samples:
Free
- Delivery Time:
In 30days,According To Client
- Packing:
As Client'S Requirement
- Delivery Port:
Qingdao/Shanghai/Shenzhen
- Max. Production Capacity:
80000sets/Per Month
- Export Ratio:
11% - 20%
- OE Experience:
No
Product Name:Clucth Plate for BMW
Clucth Plate for BMW
Application
BMW, fiat, Mercedes Benz, Nissan, Renault, Toyota, volvo, VW
Product Description:
Our Clutch disc features
1) We have a wide range of clutch disc items available for American, European, Japanese, and Korean Vehicles, OD range from 150mm - 440mm.
2)More than 500 different models, We guarantee all of clutch disc to be of the highest standard.
3) We can develop according to customers drawings or samples.
4) Material: High quality non-asbestos clutch facing, High quality toque spring with material 60 Si2Mn, Forging clutch hubs.
5) OEM heattreatment system for processing.
6) Steady force transmission, Reliable transfer torque.
7) Excellent radiative performance.
8) Long service life, Low wear and tear, Noiseless.
Changge Dingda Industry Co., Ltd specialized in manufacturing various wheel hubs, bearing blocks, brackets, flywheel covers, clutch housings. Various types of wear and heat resistance machine parts (gray iron, ductile iron, vermicular iron, alloy) research and developed by ourselves are highly ...[Read More]
Company Profile:
- Main Product:
Flywheel Cover, Clutch Housing, Wheel Hub, Clutch Pressure Plate, Bracket, Brake Plate, Brake Shoe
- Business Type:
Manufacturer
- Current Export Market:
North America, South America, Western Europe, Eastern Europe, Eastern Asia, Southeast Asia, Mid East, Africa, Oceania
- Total Annual Sales:
USD 10,000,001 - 50,000,000
Factory Profile:
- Number of Employees:
500 - 1000 People
- Shift:
3
- Size of Factory In Square Meters:
100000
- Certification:
TS16949
- Equipment Name:
JAPAN MAZAK VerticalMachiningCenter, YOUJIA Digital Vertical Lathe, CMM, QINGHAI NO.1 HorizontalMachiningCenter, QINGHAI NO.1 HorizontalMachiningCenter, Iron Coated Sand Moulding, Paintiung Line, Physics and chemistry room, Measuring device room
Research & Development:
- Capability for Synchronized Development:
Develop according to drawing or samples provided by clients?Yes
Develop 3-D model and prototype according to client's needs?Yes
- Lead Time for New Product Development:
3months
- Tooling Design:
Design Internally
- Source of Tooling:
Made Internally
- Software/Profile:
AUTOCAD, Others