Quick Details
-
Material:
Gray Iron
-
Position:
other
-
Size:
410mm
-
Weight:
50kg
- Place of Origin:
China
- Samples:
Charge
- Sample Price:
50
- Delivery Time:
According To The Quantity
- Packing:
Pallets
- Delivery Port:
Qingdao
- Max. Production Capacity:
300000
- Export Ratio:
61% - 70%
- OE Experience:
No
Product Name:Brake Drum BPW 0310677210
Brake Drum BPW 0310677210
Application
bpw
Product Description:
OEM No/Model: 0310677210
Specifications
Brake drum
BPW 0310677210
High quality with competitive price.
Manufacture according to your requirements.
Brake drum
BPW 0310677210
Detailed Product Description
Features:
1) Standard material according to technical drawing
2) OEM quality standard guaranteed
3) Long lasting working life time
4) Positive customer feedback from abroad and domestic market
5) Long exporting history
6) Competitive price level
7) Able to produce according to specification with technical drawing
8) Sample purpose order accepted
9) Packing according to specification required
10) Flexile and convenient logistic service
Dongying Xinbo Auto Parts Co., Ltd.is one of the top biggest manufacturers of brake pads, brake shoes , brake disc and brake drum in China.
Presently there are more than 2700 items brake pads and brake shoes, 6000 reference brake disc and brake drum that we can produce for passenger car and ...[Read More]
Company Profile:
- Main Product:
Brake Pad,Brake Shoe,Brake Disc,Brake Drum
- Business Type:
Manufacturer
- Current Export Market:
North America, South America, Western Europe, Eastern Europe, Eastern Asia, Southeast Asia, Mid East, Africa, Oceania
- Total Annual Sales:
USD 1,000,001 - 2,000,000
Factory Profile:
- Number of Employees:
201 - 300 People
- Shift:
2
- Size of Factory In Square Meters:
20000
- Certification:
TS16949
- Equipment Name:
Hot press machine, Painting Machine, Vertical CNC Machine
Research & Development:
- Capability for Synchronized Development:
Develop according to drawing or samples provided by clients?Yes
Develop 3-D model and prototype according to client's needs?Yes
- Lead Time for New Product Development:
10 days
- Tooling Design:
Outsourcing or Cooperation
- Source of Tooling:
Made Internally